• <b id="h1pkn"><address id="h1pkn"></address></b>
  • <source id="h1pkn"></source>

  • <tt id="h1pkn"><source id="h1pkn"></source></tt>
    <xmp id="h1pkn"></xmp>
    <b id="h1pkn"></b>

    <source id="h1pkn"><address id="h1pkn"><kbd id="h1pkn"></kbd></address></source>
    <u id="h1pkn"><small id="h1pkn"></small></u>
    <b id="h1pkn"></b>
      <b id="h1pkn"></b>
      <xmp id="h1pkn"></xmp>
    1. Welcome to"Suzhou Doer Gas & Chemical Equipment Co., Ltd" website!

      Hotline: +86 512-81666096
      0512-66182570

      Hotline

      +86 512-81666096
      Industry

      Now:Home > News > Industry

      106,Preparation before construction of large atmospheric storage tank (2) - Doer equipment

      Classification:Industry PublishTime:2019-11-07 13:39:20

      Preparation before construction of large atmospheric storage tank (2)


      Construction technology training: the technical training should be done well in the preparation stage of tank construction, as shown in the table below:


      List of construction technology training:


      Foundation acceptance: before the tank bottom plate is laid, the tank foundation shall be accepted. If it is found to be unqualified, it shall be handled in time. The quality standard of foundation acceptance is shown in the following table:

      The foundation shall be provided with settlement observation points, which shall be recorded at the time of handover, and the observation points shall be remeasured and recorded.



      Home Product Case Top
    2. <b id="h1pkn"><address id="h1pkn"></address></b>
    3. <source id="h1pkn"></source>

    4. <tt id="h1pkn"><source id="h1pkn"></source></tt>
      <xmp id="h1pkn"></xmp>
      <b id="h1pkn"></b>

      <source id="h1pkn"><address id="h1pkn"><kbd id="h1pkn"></kbd></address></source>
      <u id="h1pkn"><small id="h1pkn"></small></u>
      <b id="h1pkn"></b>
        <b id="h1pkn"></b>
        <xmp id="h1pkn"></xmp>
      1. 幻女bbwxxxx4444